PASS-SWIO Documents
|
In this section we list all of the public
documents from the PASS-SWIO project.
|
Deliverables
|
D1.1 Training Material (available soon, under review)
|
D2.2 Portagauge installation and operation instructions, English
|
D2.2 Portagauge installation and operation instructions, French
|
D3.1 Data Set and Report for Tide Gauge and Satellite Data (available soon, under review)
|
D3.2 Validation Report (available soon, under review)
|
D3.3 Sea Level Variability Report (available soon, under review)
|
D4.1 Implementation Road Map (available soon, under preparation)
|
D5.3 Executive Summary Report (available soon, under preparation) |
D5.4 Final Report (available soon, under preparation) |
D5.5 Communications Package (available soon, under preparation) |
D5.7 Final Presentation (available soon, under preparation) |
Other Documents
|
Technical Note on the Analysis of Sentinel-3 Altimeter Data at the Coast of Madagascar. David Cotton and Andrew Shaw, December 2023
|
PASS-SWIO User Requirements Survey, Summary of Results
|
PASS-SWIO Stakeholder Slides (English), February 2024
|
PASS-SWIO Stakeholder Slides (French), February 2024
|